Narration of DURA-ABV™ with Banjo EVX® Electric Valve Video
This demonstration features a 2” transfer pump and a Handler with a 2” venturi system.
The pump is running and water is flowing through the system. The manual valves on the concentrate tanks are open and the “AB switch” on the Dura-Meter is in the “Auto” position.
-Turn the valve from the “full-flow” position to the “venturi draw” position.
-Open the 2” valve that feeds the venturi.
-Press any button on the Dura-Meters to wake them up.
-With the desired amounts set, push the button under “Start” on each meter.
-The Banjo EVX® valves will each open and the venturi will draw product through the meter and valve.
-When the batch is complete, the Dura-Meter will signal the Banjo valve to close.
-Open the water valve to flush the venturi line after each batch.
-Close the 2” valve feeding the venturi.
-Turn the valve from “venturi draw” position to “full-flow” position.